| Electronic Components Datasheet Search |
|
MAX6305 Datasheet(PDF) 2 Page - Maxim Integrated Products |
|
|
|||||||||||||||||||||||||||||
MAX6305 Datasheet(HTML) 2 Page - Maxim Integrated Products |
|
2 / 8 page ![]() Supervisory Circuit Evaluation Kit 2 _______________________________________________________________________________________ Quick Start Before you begin, you will need the following equip- ment: • A 1V to 5.5V variable DC power supply • A voltmeter • A trimmer potentiometer adjustment tool (small flat-blade screwdriver) Table 1 lists the features that can be emulated by the SUPEVKIT. Refer to the corresponding device’s data sheet to look up the specifications for these features. To configure the supervisory circuit, take the following steps: 1) Install jumpers JU2–JU5 in the positions listed in Table 1. Example: For the MAX6320PUK33BX-T, the jumper settings are JU2 = 2-3, JU3 = open, JU4 = closed, and JU5 = closed. 2) Set the reset timeout period, referring to Table 2 to determine which trace (if any) needs to be cut. Example: For the MAX6320PUK33BX-T, the reset timeout period is 20ms, so it is necessary to cut the trace between C5 and C6. 3) If the selected supervisory circuit has a watchdog timeout feature, consult Table 3 to determine which capacitor value to use for C2 and which position to use for jumper JU1. Example: For the MAX6320PUK33BX-T, the watch- dog timeout period is 71ms. Use a value of 0.039µF for capacitor C2. Jumper JU1 should be in the 2-3 position. 4) Turn on the power supply and connect it to the volt- meter. Set the power-supply voltage to the desired reset threshold voltage. The accuracy of the trip threshold is determined by the accuracy of the volt- meter. Example: For the MAX6320PUK33BX-T, set the power supply to 3.30V. 5) Connect the power supply to the SUPEVKIT at the pads labeled VCC and GND. The SUPEVKIT oper- ates from +1V to +5.5V. The supply voltage must not exceed +5.5V. 6) Connect the voltmeter to the pads labeled TP and GND. 7) Turn potentiometer R18 clockwise until the volt- meter reading goes high (approximately equal to VCC). Then slowly turn potentiometer R18 counter- clockwise until the voltmeter reading decreases to 0. The reset threshold voltage on the SUPEVKIT is now set. 8) Connect the SUPEVKIT to the test circuit, using the device inputs and outputs listed in Table 1. Example: The MAX6320PUK33BX-T uses pads MR, WDI, and RESETOD. Detailed Description Watchdog Circuit A watchdog circuit consists of an input (WDI) and an output (RESET). If WDI is not toggled within the watch- dog timeout period (which is a predetermined amount of time), then a RESET is issued. Disable the watchdog function by installing jumper JU3. Capacitor C2 selects the watchdog timeout period. To choose a value for this capacitor, refer to Table 3 or use the following formula: C2 = tWD / 2.67 where tWD is the watchdog timeout period in µs and C2 is in pF. The SUPEVKIT features two modes of watchdog timer operation: normal mode and extended mode. In normal mode (JU1 = 2-3), the formula shown above deter- mines the watchdog timeout period. In extended mode (JU1 = 1-2), the watchdog timeout (tWD) is multiplied by a factor of 500. Note: In extended mode operation, leaving pad WDI floating disables the watchdog feature. Reset Outputs The SUPEVKIT has five reset outputs: active-low push/pull (RESET), active-low bidirectional (RESETBD), active-low open-drain (RESETOD), active-high push/pull (RESET), and active-high open-drain (RESETOD). These outputs are valid down to VCC = 1V. The reset timeout period is the amount of time RESET is asserted after VCC rises above the reset threshold voltage. Capacitors C1, C5, C6, and C7 set the reset timeout period. The SUPEVKIT comes with the period set at 1120ms. To change the period to either 1ms, 20ms, or 140ms, cut a PC board trace as specified in Table 2. The bidirectional reset output of the SUPEVKIT is valid only for reset threshold voltages down to 2.63V. Undervoltage Setup Potentiometer R18 sets the undervoltage reset thresh- old. To enable the undervoltage reset feature, install the jumpers in the positions specified in Table 4. Use a volt- meter to set the power-supply voltage to the desired trip |
|
|
Link URL |
| Does ALLDATASHEET help your business so far? [ DONATE ] |
About Alldatasheet | Advertisement | Contact us | Privacy Policy | Link to Datasheet | Link Exchange | Manufacturer List All Rights Reserved©Alldatasheet.com |
| Russian : Alldatasheetru.com | Korean : Alldatasheet.co.kr | Spanish : Alldatasheet.es | French : Alldatasheet.fr | Italian : Alldatasheetit.com Portuguese : Alldatasheetpt.com | Polish : Alldatasheet.pl | Vietnamese : Alldatasheet.vn Indian : Alldatasheet.in | Mexican : Alldatasheet.com.mx | British : Alldatasheet.co.uk | New Zealand : Alldatasheet.co.nz |
|
Family Site : ic2ic.com |
icmetro.com |