Electronic Components Datasheet Search
  English  ▼

X  

RT8279GSP Datasheet(PDF) 3 Page - Richtek Technology Corporation

Part # RT8279GSP
Description  RT8279 Step-Down Converter Evaluation Board
PDF  8 Pages
Scroll/Zoom Zoom In 100%  Zoom Out
Manufacturer  RICHTEK [Richtek Technology Corporation]
Direct Link  http://www.richtek.com
Logo RICHTEK - Richtek Technology Corporation

RT8279GSP Datasheet(HTML) 3 Page - Richtek Technology Corporation

  RT8279GSP Datasheet HTML 1Page - Richtek Technology Corporation RT8279GSP Datasheet HTML 2Page - Richtek Technology Corporation RT8279GSP Datasheet HTML 3Page - Richtek Technology Corporation RT8279GSP Datasheet HTML 4Page - Richtek Technology Corporation RT8279GSP Datasheet HTML 5Page - Richtek Technology Corporation RT8279GSP Datasheet HTML 6Page - Richtek Technology Corporation RT8279GSP Datasheet HTML 7Page - Richtek Technology Corporation RT8279GSP Datasheet HTML 8Page - Richtek Technology Corporation  
Zoom Inzoom in Zoom Outzoom out
 3 / 8 page
background image
RT8279GSP
Evaluation Board
EVB_RT8279GSP-00
June 2015
http://www.richtek.com
your power partner.
Evaluation Board
Please carefully inspect the EVB IC and external components, comparing them to the following Bill of Materials, to ensure that all components
are installed and undamaged. If any components are missing or damaged during transportation, please contact the distributor or send e-mail to
evb_service@richtek.com
Test Points
The EVB is provided with the test points and pin names listed in the table below.
Test point/Pin name
Signal
Comment (expected waveforms or voltage levels on test points)
VIN
Input voltage
Input voltage range = 5.5V to 36V
VOUT
Output voltage
Output voltage = 2.4V
SW
Switch Node
EN
Chip Enable Operation
The EN pin is externally pulled to High by adding a 1
00kΩ resistor
(R4) from the VIN pin in this EVB setting. For another enable
operation, pull the EN pin low (<0.4V) will shutdown the device,
drive the EN pin to high (>1.4V, <5.5V) will turn on the device
again.
GND
Ground
Ground
Power-up & Measurement Procedure
1.
Connect input power (5.5V< VIN < 36V) and input ground to Vin and GND pins respectively.
2.
Connect positive end and negative end of load to VOUT and GND of output pins respectively.
3.
The output voltage of (VOUT) can be set by R1 and R2.
VOUT = VREF * (1+R1/R2)
where VREF = 1.222V (typ.)



Html Pages

1 2 3 4 5 6 7 8


Datasheet Download

Go To PDF Page


Link URL



Does ALLDATASHEET help your business so far?  [ DONATE ] 

About Alldatasheet   |   Advertisement   |   Contact us   |   Privacy Policy   |   Link to Datasheet    |   Link Exchange   |   Manufacturer List
All Rights Reserved©Alldatasheet.com


Mirror Sites
English : Alldatasheet.com  |   English : Alldatasheet.net  |   Chinese : Alldatasheetcn.com  |   German : Alldatasheetde.com  |   Japanese : Alldatasheet.jp
Russian : Alldatasheetru.com  |   Korean : Alldatasheet.co.kr  |   Spanish : Alldatasheet.es  |   French : Alldatasheet.fr  |   Italian : Alldatasheetit.com
Portuguese : Alldatasheetpt.com  |   Polish : Alldatasheet.pl  |   Vietnamese : Alldatasheet.vn
Indian : Alldatasheet.in  |   Mexican : Alldatasheet.com.mx  |   British : Alldatasheet.co.uk  |   New Zealand : Alldatasheet.co.nz
Family Site : ic2ic.com  |   icmetro.com