| Electronic Components Datasheet Search |
|
MBSP-2 Datasheet(PDF) 4 Page - Pentair plc. All rights reserved. |
|
|
|||||||||||||||||||||||||||||
MBSP-2 Datasheet(HTML) 4 Page - Pentair plc. All rights reserved. |
|
4 / 40 page ![]() Installation 4 Figure 2: Typical installation with separate discharge pipes. Figure 3: Typical installation with common discharge pipe. Common Discharge NOTICE: In this installation, if the Primary Sump Pump (PSP) does not have a check valve installed below the wye, you MUST install a check valve for the PSP as shown.This prevents backflow of water into the sump from the Batter Backup Unit. Check Valve Flapper(s) must swing AWAY and flow arrow(s) must point AWAY from the pump being protected. The water level when the switch shuts off must be above must be above the BBU pump intake. Typical installation, assembled. Not to scale. Wiring omited for clarity. * Supplied with the Battery Backup Unit. Intems in italics must be purchased separately. Both check valves must be installed on the pump side of the wye. 1-1/2” PVC Upper Discharge Pipe (cut to fit) U74-68 Hose and Clamp Assembly 1-1/2” PVC Riser Pipe (cut to fit) 45 degree Slip Wye Optional 1-1/2” PVC Pipe (cut to fit) 45 degee slip elbow Battery Backup Switch* Alternate Wye/Elbow Setup |
|
Link URL |
| Does ALLDATASHEET help your business so far? [ DONATE ] |
About Alldatasheet | Advertisement | Contact us | Privacy Policy | Link to Datasheet | Link Exchange | Manufacturer List All Rights Reserved©Alldatasheet.com |
| Russian : Alldatasheetru.com | Korean : Alldatasheet.co.kr | Spanish : Alldatasheet.es | French : Alldatasheet.fr | Italian : Alldatasheetit.com Portuguese : Alldatasheetpt.com | Polish : Alldatasheet.pl | Vietnamese : Alldatasheet.vn Indian : Alldatasheet.in | Mexican : Alldatasheet.com.mx | British : Alldatasheet.co.uk | New Zealand : Alldatasheet.co.nz |
|
Family Site : ic2ic.com |
icmetro.com |