| Electronic Components Datasheet Search |
|
MBSP-2 Datasheet(PDF) 5 Page - Pentair plc. All rights reserved. |
|
|
|||||||||||||||||||||||||||||
MBSP-2 Datasheet(HTML) 5 Page - Pentair plc. All rights reserved. |
|
5 / 40 page ![]() Installation 5 INSTALLATION (Typical): Separate Discharge Risk of electrical shock. Can shock, burn, or kill. Unplug the primary sump pump before beginning this procedure. NOTICE: Allow for overlap when cutting piping and run a trial (dry) fitting before you glue. 1. Use PTFE pipe thread sealant tape on male ends of discharge pipe. Thread the 1-1/4” x 1-1/2” elbow (supplied) onto the discharge. When tight, the elbow must point up. 2. If possible, install the Battery Backup Unit (BBU) on the floor of the sump; be sure that the two pumps do not touch each other and do not interfere with switch operation. NOTICE: If debris or gravel is present in the bottom of the sump pit that could get sucked up into the pump, set both the primary sump pump and the BBU up on bricks or cinder blocks to prevent clogging. 3. If the sump is too small to allow both pumps to sit on the bottom of the sump, install an angle bracket on the primary sump pump’s discharge pipe with stainless steel hose clamps. Mount the backup pump on the angle bracket. See Figure 1, “Separate Discharge”. 4. Cut a piece of 1-1/2” PVC pipe to reach from the back- up pump discharge elbow to about one (1) foot above the basement floor. This is the lower discharge pipe. 5. To prevent airlocking the pump during operation, drill a 1/8” hole in the lower discharge pipe about 2” above the bottom of the pipe (below floor level). 6. Install FP0026-10 check valve (purchase separately) on the upper end of the pipe. Tighten the hose clamps securely. BE SURE that the flow arrows point UP (away from the BBU). If they point down, the valve will not pass water and the pump will not work. 7. Cut a short length of 1-1/2” PVC pipe for a riser pipe and clamp it into the top of the check valve. 8. Install a U74-68 Hose and Clamp Assembly on the top of the riser pipe. For 1-1/2” pipe, remove and discard the short piece of 1-1/4” hose in the Hose and Clamp Assembly. Leave the hose clamps loose and slide the Assembly down below the top of the riser pipe. 9. Determine where you want the discharge to exit the basement. At that point, drill the necessary holes (large enough to have clearance for a 1-1/2” pipe) to allow you to run the discharge pipe from above the sump to the outdoors. 10. Install the horizontal discharge pipe. Install a 90° elbow on the inside end but do not glue. 11. Cut another short piece of 1-1/2” PVC for the Upper Discharge Pipe to run from the top of the riser pipe up to the 90° elbow. Be sure to allow enough overlap for the glue joint in the elbow. 12. Do a trial fit with NO GLUE, installing the 1-1/2” upper discharge pipe in the 90° elbow and the upper discharge pipe in the vertical end of the 90° elbow. The upper discharge pipe should just fit between the riser pipe and the elbow. 13. Risk of fire and chemical inhalation. Whenever using PVC primer and PVC cement, follow the glue manufacturer’s instructions. 14. Make sure that the BBU will clear the primary sump pump and its switch. If there isn’t room for both pumps to sit on the floor of the sump, the BBU will have to be raised (depending on your particular situation). 15. Clean, prime and glue the upper discharge pipe into the 90º elbow. When the glue has set, slide the Hose and Clamp Assembly up to cover the joint and tighten all the hose clamps. 16. Install the Battery Backup Switch as shown, 1” above start water level of primary pump. Fasten it to the pipe with cable ties. 17. Tape the pump cord to the riser pipe so that the plug cannot fall into the sump. 18. Go to “BBU WIRING AND SETUP” (Page 8) for wiring instructions. 19. Once all wiring is complete, fill your pit with water and verify that the PSP removes the water and the BBU doesn’t run. Then, unplug your PSP and refill your pit with water. Verify that the BBU pump removes the water. 20. Make sure that the power is on to both pumps, and your system is ready to use. |
|
Link URL |
| Does ALLDATASHEET help your business so far? [ DONATE ] |
About Alldatasheet | Advertisement | Contact us | Privacy Policy | Link to Datasheet | Link Exchange | Manufacturer List All Rights Reserved©Alldatasheet.com |
| Russian : Alldatasheetru.com | Korean : Alldatasheet.co.kr | Spanish : Alldatasheet.es | French : Alldatasheet.fr | Italian : Alldatasheetit.com Portuguese : Alldatasheetpt.com | Polish : Alldatasheet.pl | Vietnamese : Alldatasheet.vn Indian : Alldatasheet.in | Mexican : Alldatasheet.com.mx | British : Alldatasheet.co.uk | New Zealand : Alldatasheet.co.nz |
|
Family Site : ic2ic.com |
icmetro.com |