| Electronic Components Datasheet Search |
|
ADC08D1000EVAL Datasheet(PDF) 32 Page - National Semiconductor (TI) |
|
|
|
|||||||||||||||||||||||||||||
ADC08D1000EVAL Datasheet(HTML) 32 Page - National Semiconductor (TI) |
|
32 / 37 page ![]() 2.0 Applications Information (Continued) Input clock amplitudes above those specified in the Electrical Characteristics Table may result in increased input offset voltage. This would cause the converter to produce an out- put code other than the expected 127/128 when both input pins are at the same potential. 2.4 CONTROL PINS Six control pins (without the use of the serial interface) provide a wide range of possibilities in the operation of the ADC08D1000 and facilitate its use. These control pins pro- vide Full-Scale Input Range setting, Self Calibration, Calibra- tion Delay, Output Edge Synchronization choice, LVDS Out- put Level choice and a Power Down feature. 2.4.1 Full-Scale Input Range Setting The input full-scale range can be selected to be either 650 mV P-P or 870 mVP-P, as selected with the FSR control input (pin 14) in the Normal Mode of operation. In the Extended Control Mode, the input full-scale range may be set to be anywhere from 560 mV P-P to 840 mVP-P. See Section 2.2 for more information. 2.4.2 Self Calibration The ADC08D1000 self-calibration must be run to achieve specified performance. The calibration procedure is run upon power-up and can be run any time on command. The calibration procedure is exactly the same whether there is an input clock present upon power up or if the clock begins some time after application of power. The CalRun output indicator is high while a calibration is in progress. Note that DCLK outputs are not active during a calibration cycle. 2.4.2.1 Power-On Calibration Power-on calibration begins after a time delay following the application of power. This time delay is determined by the setting of CalDly, as described in the Calibration Delay Sec- tion, below. The calibration process will be not be performed if the CAL pin is high at power up. In this case, the calibration cycle will not begin until the on-command calibration conditions are met. The ADC08D1000 will function with the CAL pin held high at power up, but no calibration will be done and perfor- mance will be impaired. A manual calibration, however, may be performed after powering up with the CAL pin high. See On-Command Calibration Section 2.4.2.2. The internal power-on calibration circuitry comes up in an unknown logic state. If the input clock is not running at power up and the power on calibration circuitry is active, it will hold the analog circuitry in power down and the power consump- tion will typically be less than 200 mW. The power consump- tion will be normal after the clock starts. 2.4.2.2 On-Command Calibration On-command calibration may be run at any time in NOR- MAL (non-DES) mode only. Do not run a calibration while operating the ADC in Auto DES Mode. If the ADC is operating in Auto DES mode and a calibration cycle is required then the controlling application should bring the ADC into normal (non DES) mode before an On Com- mand calibration is initiated. Once calibration has completed, the ADC can be put back into Auto DES mode. To initiate an on-command calibration, bring the CAL pin high for a minimum of 80 input clock cycles after it has been low for a minimum of 80 input clock cycles. Holding the CAL pin high upon power up will prevent execution of power-on calibration until the CAL pin is low for a minimum of 80 input clock cycles, then brought high for a minimum of another 80 input clock cycles. The calibration cycle will begin 80 input clock cycles after the CAL pin is thus brought high. The CalRun signal should be monitored to determine when the calibration cycle has completed. The minimum 80 input clock cycle sequences are required to ensure that random noise does not cause a calibration to begin when it is not desired. As mentioned in section 1.1.1 for best performance, a self calibration should be performed 20 seconds or more after power up and repeated when the operating temperature changes significantly, according to the particular system performance requirements. As can be seen in the following figures ENOB drops slightly with in- creasing junction temperature, and a self calibration elimi- nates the change. In the first example (see Figure 15), a sample clock of 1GSPS is used to capture a full-scale 749MHz signal at the I-channel input as the junction tem- perature (T J) is increased from 65˚C to 125˚C with no inter- mediate calibration cycles. The vertical line at 125˚C is the result of an on-command calibration cycle that essentially eliminates the drop in ENOB. Of course, calibration cycles can be run more often, at smaller intervals of temperature change, if system design specifications require it. In the second example (see Figure 16), the test method is the same and the I-channel input signal is 249MHz. The varia- tion in ENOB vs. T J has a smaller range then the previous example, and is again removed by an on-command calibra- tion cycle at the maximum test temperature. 20097457 FIGURE 15. ENOB vs. Junction Temperature, 749MHz input www.national.com 32 |
|
Link URL |
| Does ALLDATASHEET help your business so far? [ DONATE ] |
About Alldatasheet | Advertisement | Contact us | Privacy Policy | Link to Datasheet | Link Exchange | Manufacturer List All Rights Reserved©Alldatasheet.com |
| Russian : Alldatasheetru.com | Korean : Alldatasheet.co.kr | Spanish : Alldatasheet.es | French : Alldatasheet.fr | Italian : Alldatasheetit.com Portuguese : Alldatasheetpt.com | Polish : Alldatasheet.pl | Vietnamese : Alldatasheet.vn Indian : Alldatasheet.in | Mexican : Alldatasheet.com.mx | British : Alldatasheet.co.uk | New Zealand : Alldatasheet.co.nz |
|
Family Site : ic2ic.com |
icmetro.com |