| Electronic Components Datasheet Search |
|
SH3100IMTR Datasheet(PDF) 9 Page - Semtech Corporation |
|
|
|||||||||||||||||||||||||||||
SH3100IMTR Datasheet(HTML) 9 Page - Semtech Corporation |
|
9 / 80 page ![]() SH3100 POWER MANAGEMENT 9 © 2006 Semtech Corp. www.semtech.com The main power supply is between VDD and GND and may have any value between 1.7V and 5.5V for normal opera- tion. In order to guarantee start-up, VDD should initially be taken to at least 100mV above the reset threshold (VBO) in order to overcome the reset threshold hysteresis; e.g., for a VBO level of 2.8V, VDD must initially rise to at least 2.9V for the chip to come out of reset. The battery backup supply is between VBAK and GND. The SH3100 switches to VBAK, if VDD drops below VBO and VBAK is within its valid operating range of 0.9V to 5.5V for battery backup. While VBAK is within its valid operating range during bat- tery backup, RTC operation is maintained and those reg- ister contents not reset by a VBO reset event (Brownout) are maintained. Any functions not required during battery backup are shut down to save power. Note: If the 32.768kHz system clock output is enabled on CLK1 during battery backup then the maximum VBAK voltage for valid CLK1 output is 4.5V. Battery backup continues for VBAK voltages above 4.5V, but the CLK1 output is no longer guaranteed to function correctly. Power Supplies & Battery Backup When running in battery backup from the 32.768kHz crystal oscillator, full RTC accuracy is maintained down to the minimum VBAK of 0.9V. When running in battery backup from the internal 32.768kHz oscillator, RTC accuracy is maintained only down to a VBAK level of 1.7V. Below this point, operation continues down to 0.9V, but a flag is set to indicate that the internal oscillator can no longer be guaranteed to be within ±3% of 32.768kHz. The minimum VBAK level is guaranteed as 0.9V; however, depending on process variations, operation may continue down to 0.7V before battery back up fails. An unpowered (cold) chip starts up and initializes only when VDD is applied. Applying only VBAK to a cold chip does not cause it to start up. Battery backup facility is only enabled once the chip has come out of reset after an initial power-up. |
|
Link URL |
| Does ALLDATASHEET help your business so far? [ DONATE ] |
About Alldatasheet | Advertisement | Contact us | Privacy Policy | Link to Datasheet | Link Exchange | Manufacturer List All Rights Reserved©Alldatasheet.com |
| Russian : Alldatasheetru.com | Korean : Alldatasheet.co.kr | Spanish : Alldatasheet.es | French : Alldatasheet.fr | Italian : Alldatasheetit.com Portuguese : Alldatasheetpt.com | Polish : Alldatasheet.pl | Vietnamese : Alldatasheet.vn Indian : Alldatasheet.in | Mexican : Alldatasheet.com.mx | British : Alldatasheet.co.uk | New Zealand : Alldatasheet.co.nz |
|
Family Site : ic2ic.com |
icmetro.com |