| Electronic Components Datasheet Search |
|
WHASC Datasheet(PDF) 7 Page - Whirlpool. |
|
|
|||||||||||||||||||||||||||||
WHASC Datasheet(HTML) 7 Page - Whirlpool. |
|
7 / 10 page ![]() 7 Installation Instructions 5. COMPLETE PLUMBING TO AND FROM THE SYSTEM Using the “Typical Installation Illustrations” on the previous page as a guide, observe all of the following instructions while you connect inlet and outlet plumb- ing: = Be sure incoming, untreated water is directed to the “UPFLOW INLET” port. It may be necessary to plumb a crossover if the water pipe’s flow is from right to left. = Be sure to install bypass valve(s). = If making a soldered copper installation, do all sweat soldering before connecting pipes to the included plastic adapters. Torch heat will damage plastic parts. = Use pipe joint compound on all external pipe threads. = When turning threaded pipe fittings onto plastic fittings, use care not to cross-thread. = Support inlet and outlet plumbing in some manner (use pipe hangers) to keep the weight off of the system. 6. FLUSH PIPES AND TEST FOR LEAKS IMPORTANT: To avoid water or air pressure damage to system inner parts, be sure to do the following steps exactly as listed: a. Fully open two treated water faucets, one cold and one hot, nearby the system. b. Place bypass valve(s) into BYPASS position. On a single valve, turn both handles perpendicular to water flow (See Fig. 5). On a 3 valve system, close the inlet and outlet valves, and open the bypass valve (See Fig. 4). c. Fully open the house main water pipe shutoff valve. Observe a steady flow from both opened faucets. d. Close both faucets. e. Check your plumbing work for leaks and, if any are found, fix right away. Be sure to observe all instruc- tions in the previous section, “Complete Plumbing to and from the System”. f. Turn on the gas or electric supply to the water heater. Light the pilot, if applicable. 7. START UP PROCEDURE a. Place bypass valve(s) into SERVICE position, EXACTLY as follows: = Single Bypass Valve: Turn the outlet (marked downflow inlet on head) handle parallel to water flow. Slowly turn the upflow inlet handle parallel to water flow, pausing several times to allow the system to pressurize slowly. = 3 Valve Bypass: Fully close the bypass valve and open the outlet valve. Slowly open the inlet valve, pausing several times to allow the system to pressurize slowly. b. Check all connections for leaks. c. Fully open a cold water faucet, downstream from the system, and allow 50 gallons (190 liters) of water to pass through the system. This should take at least 20 minutes. Close the faucet. d. Snap the top cover back in place on top of the rim. |
|
|
Link URL |
| Does ALLDATASHEET help your business so far? [ DONATE ] |
About Alldatasheet | Advertisement | Contact us | Privacy Policy | Link to Datasheet | Link Exchange | Manufacturer List All Rights Reserved©Alldatasheet.com |
| Russian : Alldatasheetru.com | Korean : Alldatasheet.co.kr | Spanish : Alldatasheet.es | French : Alldatasheet.fr | Italian : Alldatasheetit.com Portuguese : Alldatasheetpt.com | Polish : Alldatasheet.pl | Vietnamese : Alldatasheet.vn Indian : Alldatasheet.in | Mexican : Alldatasheet.com.mx | British : Alldatasheet.co.uk | New Zealand : Alldatasheet.co.nz |
|
Family Site : ic2ic.com |
icmetro.com |