| Electronic Components Datasheet Search |
|
CM6802AXIP Datasheet(PDF) 20 Page - Champion Microelectronic Corp. |
|
|
|||||||||||||||||||||||||||||
CM6802AXIP Datasheet(HTML) 20 Page - Champion Microelectronic Corp. |
|
20 / 25 page ![]() CM6802A/B/AH/BH (Dynamic Soft PFC/Green PWM) http://www.championmicro.com.tw EPA/80++ ZVS-Like PFC/PWM COMBO CONTROLLER Design for High Efficient Power Supply at both Full Load and Light Load 2009/11/02 Rev. 1.4 Champion Microelectronic Corporation 20 PWM Control (RAMP2) When the PWM section is used in current mode, RAMP2 is generally used as the sampling point for a voltage representing the current on the primary of the PWM’s output transformer, derived either by a current sensing resistor or a current transformer. In voltage mode, it is the input for a ramp voltage generated by a second set of timing components (RRAMP2, CRAMP2),that will have a minimum value of zero volts and should have a peak value of approximately 5V. In voltage mode operation, feed-forward from the PFC output buss is an excellent way to derive the timing ramp for the PWM stage. Soft Start (SS) Start-up of the PWM is controlled by the selection of the external capacitor at SS. A current source of 10 μ A supplies the charging current for the capacitor, and start-up of the PWM begins at SS~1.4V. Start-up delay can be programmed by the following equation: CSS = tDELAY x 1.8V A 10 μ where CSS is the required soft start capacitance, and the tDEALY is the desired start-up delay. It is important that the time constant of the PWM soft-start allow the PFC time to generate sufficient output power for the PWM section. The PWM start-up delay should be at least 5ms. Solving for the minimum value of CSS: CSS = 5ms x 1.8V A 10 μ ≒ 27nF Caution should be exercised when using this minimum soft start capacitance value because premature charging of the SS capacitor and activation of the PWM section can result if VFB is in the hysteresis band of the 380V-OK comparator at start-up. The magnitude of VFB at start-up is related both to line voltage and nominal PFC output voltage. Typically, a 0.05 μ F soft start capacitor will allow time for V FB and PFC out to reach their nominal values prior to activation of the PWM section at line voltages between 90Vrms and 265Vrms. Generating VCC After turning on CM6802A/B/AH/BH at 13V, the operating voltage can vary from 10V to 17.9V. That’s the two ways to generate VCC. One way is to use auxiliary power supply around 15V, and the other way is to use bootstrap winding to self-bias CM6802A/B/AH/BH system. The bootstrap winding can be either taped from PFC boost choke or from the transformer of the DC to DC stage. The ratio of winding transformer for the bootstrap should be set between 18V and 15V. A filter network is recommended between VCC (pin 13) and bootstrap winding. The resistor of the filter can be set as following. RFILTER x IVCC ~ 2V, IVCC = IOP + (QPFCFET + QPWMFET ) x fsw IOP = 3mA (typ.) If anything goes wrong, and VCC goes beyond 19.4V, the PFC gate (pin 12) drive goes low and the PWM gate drive (pin 11) remains function. The resistor’s value must be chosen to meet the operating current requirement of the CM6802A/B/AH/BH itself (5mA, max.) plus the current required by the two gate driver outputs. EXAMPLE: With a wanting voltage called, VBIAS ,of 18V, a VCC of 15V and the CM6802A/B/AH/BH driving a total gate charge of 90nC at 100kHz (e.g. 1 IRF840 MOSFET and 2 IRF820 MOSFET), the gate driver current required is: IGATEDRIVE = 100kHz x 90nC = 9mA RBIAS = G CC CC BIAS I I V V + − RBIAS = 9mA 5mA 15V 18V + − Choose RBIAS = 214Ω The CM6802A/B/AH/BH should be locally bypassed with a 1.0 μ F ceramic capacitor. In most applications, an electrolytic capacitor of between 47 μ F and 220 μ F is also required across the part, both for filtering and as part of the start-up bootstrap circuitry. Leading/Trailing Modulation Conventional Pulse Width Modulation (PWM) techniques employ trailing edge modulation in which the switch will turn on right after the trailing edge of the system clock. The error amplifier output is then compared with the modulating ramp up. The effective duty cycle of the trailing edge modulation is determined during the ON time of the switch. Figure 4 shows a typical trailing edge control scheme. |
|
|
Link URL |
| Does ALLDATASHEET help your business so far? [ DONATE ] |
About Alldatasheet | Advertisement | Contact us | Privacy Policy | Link to Datasheet | Link Exchange | Manufacturer List All Rights Reserved©Alldatasheet.com |
| Russian : Alldatasheetru.com | Korean : Alldatasheet.co.kr | Spanish : Alldatasheet.es | French : Alldatasheet.fr | Italian : Alldatasheetit.com Portuguese : Alldatasheetpt.com | Polish : Alldatasheet.pl | Vietnamese : Alldatasheet.vn Indian : Alldatasheet.in | Mexican : Alldatasheet.com.mx | British : Alldatasheet.co.uk | New Zealand : Alldatasheet.co.nz |
|
Family Site : ic2ic.com |
icmetro.com |