| Electronic Components Datasheet Search |
|
LNK501P Datasheet(PDF) 9 Page - Power Integrations, Inc. |
|
|
|||||||||||||||||||||||||||||
LNK501P Datasheet(HTML) 9 Page - Power Integrations, Inc. |
|
9 / 20 page ![]() 9 F 9/02 LNK501 At very light or no-load, typically less than 2 mA of output current, the output voltage rises due to leakage inductance peak charging of the secondary. This voltage rise can be reduced with a small preload with little change to no-load power consumption. The output voltage load variation can be improved to be ±5% across the whole load range by adding an optocoupler and secondary reference (Figure 6). The secondary reference is designed to only provide feedback above the normal peak power point voltage to maintain the correct constant current characteristic. Component Selection The schematic shown in Figure 5 outlines the key components needed for a LinkSwitch Supply. Clamp diode – D1 Diode D1 should be either a fast (t rr <250 ns) or ultra-fast type (t rr <50 ns), with a voltage rating of 600 V or higher. Fast recovery types are preferred, being typically lower cost. Slow diodes are not recommended; they can allow excessive DRAIN ringing and the LinkSwitch to be reverse biased. Clamp Capacitor – C2 Capacitor C2 should be a 0.1 µF, 100 V capacitor. Low cost metallized plastic film types are recommended. The tolerance of this part has a very minor effect on the output characteristic so any of the standard ±5%, ±10% or ±20% tolerances are acceptable. Ceramic capacitors are not recommended. The common dielectrics used such as Y5U or Z5U are not stable with voltage or temperature and may cause output instability. Ceramic capacitors with high stability dielectrics may be used but are expensive compared to metallized film types. Control Pin Capacitor – C1 Capacitor C1 is used during start-up to power LinkSwitch and sets the Auto-Restart frequency. For designs that have a battery load this component should have a value of 0.22 µF and for resistive loads a value of 1 µF. This ensures there is sufficient time during start-up for the output voltage to reach regulation. Any capacitor type is acceptable with a voltage rating of 10 V or above. Feedback Resistor – R1 The value of R1 is selected to give a feedback current into the CONTROL pin of approximately 2.3 mA at the peak output power point of the supply. The actual value depends on the V OR selected during design. Any 1%, 0.25 W resistor is suitable. Output Diode – D2 Either PN fast, PN ultra fast or Schottky diodes can be used depending on the efficiency target for the supply, Schottky diodes giving higher efficiency then PN diodes. The diode voltage rating should be sufficient to withstand the output voltage plus the input voltage transformed through the turns ratio (a typical V OR of 50 V requires a diode PIV of 50 V). Slow recovery diodes are not recommended (1N400X types). Output Capacitor – C4 Capacitor C4 should be selected such that its voltage and ripple current specifications are not exceeded. LinkSwitch Layout considerations Primary Side Connections As the SOURCE pins in a LinkSwitch supply are switching nodes, the copper area connected to SOURCE together with C1, C2 and R1 (Figure 5) should be minimized, within the thermal contraints of the design, to reduce EMI coupling. The CONTROL pin capacitor C1 should be located as close as possible to the SOURCE and CONTROL pins. To minimize EMI coupling from the switching nodes on the primary to both the secondary and AC input, the LinkSwitch should be positioned away from the secondary of the transformer and AC input. Routing the primary return trace from the transformer primary around LinkSwitch and associated components further reduces coupling. Y capacitor If a Y capacitor is required, it should be connected close to the transformer secondary output return pin(s) and the primary bulk capacitor negative return. Such placement will maximize the EMI benefit of the Y capacitor and avoid problems in common-mode surge testing. Quick Design Checklist As with any power supply design, all LinkSwitch designs should be verified on the bench to make sure that component specifications are not exceeded under worst case conditions. Note: In a LinkSwitch circuit, the SOURCE is a switching node. This should be taken into consideration during testing. Oscilloscope measurements should be made with probe grounded to DC voltages such as primary return or DC rail but not to SOURCE. Power supply input voltage should always be supplied using an isolation transformer. The following minimum set of tests is strongly recommended: 1. Maximum drain voltage – Verify that V DSS does not exceed 675 V at highest input voltage and peak output power. 2. Maximum drain current – At maximum ambient temperature, maximum input voltage and peak output power, verify drain current waveforms at start-up for any signs of transformer saturation and excessive leading edge current spikes. |
|
|
Link URL |
| Does ALLDATASHEET help your business so far? [ DONATE ] |
About Alldatasheet | Advertisement | Contact us | Privacy Policy | Link to Datasheet | Link Exchange | Manufacturer List All Rights Reserved©Alldatasheet.com |
| Russian : Alldatasheetru.com | Korean : Alldatasheet.co.kr | Spanish : Alldatasheet.es | French : Alldatasheet.fr | Italian : Alldatasheetit.com Portuguese : Alldatasheetpt.com | Polish : Alldatasheet.pl | Vietnamese : Alldatasheet.vn Indian : Alldatasheet.in | Mexican : Alldatasheet.com.mx | British : Alldatasheet.co.uk | New Zealand : Alldatasheet.co.nz |
|
Family Site : ic2ic.com |
icmetro.com |