| Electronic Components Datasheet Search |
|
GPMP600 Datasheet(PDF) 3 Page - SL Power Electronics |
|
|
|||||||||||||||||||||||||||||
GPMP600 Datasheet(HTML) 3 Page - SL Power Electronics |
|
3 / 12 page ![]() Vibration Step Stress Specification Limits Minimum Specified Operating Level (No loss of operation): 1.5 grms Operational Limits Maximum Operating Level (No loss of operation): 5 grms Result Table Test Summary Infrared Baseline Photo Unit is allowed to stabilize at approximately 25°C ambient temperature, convection cooled, with 600 W output power before infrared photo is shot. See attached topside and bottomside photo. Thermal Survey Cold Start Unit is placed in the chamber, power off, and allowed to stabilize at the ambient temperature. With an oscilloscope probe attached to both the input and the output, power is applied and the time difference between application of power and output voltage is recorded. See attached chart for all configurations. Vibration Qualification One hour of random vibration in each of three (3) orthogonal axes. Profile: 0.038 g 2/hz, 20-350 hz; -60 B/oct, 350-2000 hz; 4.86 grms. HALT Temperature Cycling Step Stress and Vibration Unit is exposed to progressively more severe operating temperatures and random vibration environments. Failures that occur are diagnosed for root cause, corrective action is performed, and then the test is continued. The levels are increased unti the test extremes or the fundamental limit of the unit is reached (whether by technological or economic limitations.) C10, C40, C48 broke. L2 and part of T3 lead broken. Trace bared beneath T3. - Root Cause No RTV on C13. No RTV on C40 or C48; a little RTV on C10. RTV only between board and T2 on one end. Added RTV between board and T2 on both ends of T2. - - 7 grms, Y axis None. None. Unit reached fundamental limit of technology. 7 grms, Y axis #4 lead of T2 broke. 7 grms, X axis Added generous amounts of RTV between C40, C48, C10 and their surrounding components. - After attaching thermocouples, unit is placed in the chamber, powered on, and allowed to reach a stable temperature. Component temperature is monitored throughout the test. See attached chart for all configurations. 5 grms, Y axis Added RTV between C13 and surrounding components. Incorp. Level (grms) Corrective Action Problem C13 broke. |
|
|
Link URL |
| Does ALLDATASHEET help your business so far? [ DONATE ] |
About Alldatasheet | Advertisement | Contact us | Privacy Policy | Link to Datasheet | Link Exchange | Manufacturer List All Rights Reserved©Alldatasheet.com |
| Russian : Alldatasheetru.com | Korean : Alldatasheet.co.kr | Spanish : Alldatasheet.es | French : Alldatasheet.fr | Italian : Alldatasheetit.com Portuguese : Alldatasheetpt.com | Polish : Alldatasheet.pl | Vietnamese : Alldatasheet.vn Indian : Alldatasheet.in | Mexican : Alldatasheet.com.mx | British : Alldatasheet.co.uk | New Zealand : Alldatasheet.co.nz |
|
Family Site : ic2ic.com |
icmetro.com |