| Electronic Components Datasheet Search |
|
AS3676 Datasheet(PDF) 65 Page - ams AG |
|
|
|||||||||||||||||||||||||||||
AS3676 Datasheet(HTML) 65 Page - ams AG |
|
65 / 92 page ![]() www.austriamicrosystems.com/AS3676 1v1-4 64 - 91 AS3676 Datasheet - D e ta i l e d D e s c r i p t i o n 8.6.2 Function Testing for LEDs connected to the Step Up DCDC Converter For LEDs connected to the DCDC converter (usually current sinks CURR1,CURR2 and CURR6) use the following pro- cedure: Note: With the above described procedures electrically open and shorted LEDs can be automatically detected 7 Do the same procedure for the next LED starting from point 2 Jump to 2. If not all the LEDs have been tested 8 Switch off the charge pump set charge pump automatic mode Reg 00h 00h (cp_on = 0) Reg 23h 00h Table 103. Function Testing for LEDs connected to the DCDC converter Step Action Example Code 1 Switch on the current sink for the LED string to be tested (CURR1,2 or 6) e.g. Test LEDs on CURR1: Reg 01h 01h (curr1_mode=on) Reg 09h 3ch (curr1_current = 9mA) 2 Select the feedback path for the LED string to be tested (e.g. step_up_fb = 01 for LED string on CURR1) Reg 21h 02h (step_up_fb=curr1) 3 Set the current for step_up_vtuning exactly above the maximum forward voltage of the tested LED string + 0.6V (for the current sink) + 0.25V; add 6% margin (accuracy of step_up_vtuning); this sets the maximum output voltage limit for the DCDC converter e.g. 4 LEDs with UfMAX = 4.1V gives 17.25V +6% = 18.29V; if R2=1M and R3 = open, then select step_up_vtuning = 18 (Reg 21h 92h; results in 19.25V over voltage protection voltage – Table 9 on page 14) 4Set step_up_prot = 1 Reg 22h 04h 5 Switch on the DCDC converter Reg 00h 08h 6 Wait 80ms (DCDC_FB settling time) 7 Measure the voltage on DCDC_FB (ADC) Reg 26h 96h (adc_select=DCDC_FB, start ADC; Fetch the ADC result from Reg 27h and 28h) 8 If the voltage on DCDC_FB is above 1.0V, the tested LED string is broken – then skip the following steps (Code >199h) 9 Switch off the over voltage protection (step_up_prot=0) Reg 22h 00h 10 Reduce step_up_vtuning step by step until the measured voltage on DCDC_FB (ADC) is above 1.0V. After changing step_up_vtuning always wait 80ms, before AD-conversion e.g.: Reg 21h 62h (step_up_vtuning=12): ADC result=1,602V 11 Measure voltage on DCDC_FB e.g. DCDC_FB=1.602V 12 Switch off the DCDC converter Reg 00h 00h 13 The voltage on the LED string can be calculated now as follows (R4 = open): VLEDSTRING = V(DCDC_FB) + I(step_up_vtuning) * R2 – 0.5V (current sinks feedback voltage: VFB2). V(DCDC_FB) = ADC Measurement from point 11 I(step_up_vtuning) = last setting used for point 10 e.g.: VLED = (1.602V + 12V – 0.5V) / 4 = 3.276V 14 Compare the calculated value against the specification limits of the tested LEDs Table 102. Function Testing for LEDs connected to the Charge Pump Step Action Example Code |
|
Link URL |
| Does ALLDATASHEET help your business so far? [ DONATE ] |
About Alldatasheet | Advertisement | Contact us | Privacy Policy | Link to Datasheet | Link Exchange | Manufacturer List All Rights Reserved©Alldatasheet.com |
| Russian : Alldatasheetru.com | Korean : Alldatasheet.co.kr | Spanish : Alldatasheet.es | French : Alldatasheet.fr | Italian : Alldatasheetit.com Portuguese : Alldatasheetpt.com | Polish : Alldatasheet.pl | Vietnamese : Alldatasheet.vn Indian : Alldatasheet.in | Mexican : Alldatasheet.com.mx | British : Alldatasheet.co.uk | New Zealand : Alldatasheet.co.nz |
|
Family Site : ic2ic.com |
icmetro.com |