| Electronic Components Datasheet Search |
|
PC755 Datasheet(PDF) 27 Page - ATMEL Corporation |
|
|
|||||||||||||||||||||||||||||
PC755 Datasheet(HTML) 27 Page - ATMEL Corporation |
|
27 / 50 page ![]() 27 PC755/745 2138D–HIREL–06/03 Figure 12 provides the AC test load for the PC755. Figure 12. AC Test Load Notes: 1. Revisions prior to Rev 2.8 (Rev E) were limited in performance and did not conform to this specification. Contact your local Motorola sales office for more information. 2. Guaranteed by design and characterization. 3. t SYSCLK is the period of the external clock (SYSCLK) in nanoseconds (ns). The numbers given in the table must be multiplied by the period of SYSCLK to compute the actual time duration (in ns) of the parameter in question. 4. Per the 60x bus protocol, TS, ABB and DBB are driven only by the currently active bus master. They are asserted low then precharged high before returning to high-Z as shown in Figure 6. The nominal precharge width for TS, ABB or DBB is 0.5 x t SYSCLK, i.e. less than the minimum tSYSCLK period, to ensure that another master asserting TS, ABB, or DBB on the following clock will not contend with the precharge. Output valid and output hold timing is tested for the signal asserted. Output valid time is tested for precharge.The high-Z behavior is guaranteed by design. 5. Per the 60x bus protocol, ARTRY can be driven by multiple bus masters through the clock period immediately following AACK. Bus contention is not an issue since any master asserting ARTRY will be driving it low. Any master asserting it low in the first clock following AACK will then go to high-Z for one clock before precharging it high during the second cycle after the assertion of AACK. The nominal precharge width for ARTRY is 1.0 t SYSCLK; i.e., it should be high-Z as shown in Figure 6 before the first opportunity for another master to assert ARTRY. Output valid and output hold timing is tested for the signal asserted. Output valid time is tested for precharge. The high-Z and precharge behavior is guaranteed by design. OVDD/2 OUTPUT Z0 = 50Ω RL = 50Ω Table 14. Processor Bus AC Timing Specifications (1) at Recommended Operating Conditions Parameter Symbols All Speed Grades Unit Min Max Setup Times: All Inputs t IVKH 2.5 – ns Input Hold Times: TLBISYNC, MCP, SMI tIXKH 0.6 – ns Input Hold Times: All Inputs, except TLBISYNC, MCP, SMI tIXKH 0.2 – ns Valid Times: All Outputs t KHOV – 4.1 ns Output Hold Times: All Outputs tKHOX 1 – ns SYSCLK to Output Enable(2) tKHOE 0.5 – ns SYSCLK to Output High Impedance (all except ABB, ARTRY, DBB)(2) t KHOZ – 6 ns SYSCLK to ABB, DBB High Impedance After Precharge(2)(3)(4) tKHABPZ – 1 tSYSCLK Maximum Delay to ARTRY Precharge(2)(3)(5) tKHARP – 1 tSYSCLK SYSCLK to ARTRY High Impedance After Precharge(2)(3)(5) t KHARPZ – 2 t SYSCLK |
|
Link URL |
| Does ALLDATASHEET help your business so far? [ DONATE ] |
About Alldatasheet | Advertisement | Contact us | Privacy Policy | Link to Datasheet | Link Exchange | Manufacturer List All Rights Reserved©Alldatasheet.com |
| Russian : Alldatasheetru.com | Korean : Alldatasheet.co.kr | Spanish : Alldatasheet.es | French : Alldatasheet.fr | Italian : Alldatasheetit.com Portuguese : Alldatasheetpt.com | Polish : Alldatasheet.pl | Vietnamese : Alldatasheet.vn Indian : Alldatasheet.in | Mexican : Alldatasheet.com.mx | British : Alldatasheet.co.uk | New Zealand : Alldatasheet.co.nz |
|
Family Site : ic2ic.com |
icmetro.com |