| Electronic Components Datasheet Search |
|
DDC112 Datasheet(PDF) 14 Page - Texas Instruments |
|
|
|||||||||||||||||||||||||||||
DDC112 Datasheet(HTML) 14 Page - Texas Instruments |
|
14 / 37 page ![]() DDC112 14 SBAS085B www.ti.com TABLE V. Timing Specifications Generalized in CLK Periods. SYMBOL DESCRIPTION VALUE (CLK periods) t6 Cont mode m/r/az cycle. 4794 t7 Cont mode data ready. 4212 (tINT > 4794) 4212 ±3(t INT = 4794) t8 1st ncont mode data ready. 4212 ±3 t9 2nd ncont mode data ready. 4548 t10 Ncont mode m/r/az cycle. 9108 4 3 2 15 4 Integrate B Integrate A Integrate A Integrate B m/r/az A m/r/az B m/r/az A CONV State mbsy m/r/az Status Integration Status DVALID t6 t 7 t = 0 Power-Up Side A Data Side B Data Side A Data FIGURE 10. Continuous Mode Timing (CONV HIGH at power-up). SYMBOL DESCRIPTION VALUE (CLK = 10MHz) VALUE (CLK = 15MHz) t6 Cont mode m/r/az cycle. 479.4 µs 319.6 µs t7 Cont mode data ready. 421.2 µs(T INT > 479.4µs) 280.8 µs(T INT > 319.6µs) 421.2 ±0.3µs(T INT = 479.4µs) 280.8 ±0.2µs(T INT = 319.6µs) During the cont mode, mbsy is not active when CONV toggles. The non-integrating side is always ready to begin integrating when the other side finishes its integration. Con- sequently, keeping track of the current status of CONV is all that is needed to know the current state. Cont mode opera- tion corresponds to states 3-6. Two of the states, 3 and 6, only perform an integration (no m/r/az cycle). mbsy becomes important when operating in the ncont mode; states 1, 2, 7, and 8. Whenever CONV is toggled while mbsy is active, the DDC112 will enter or remain in either ncont state 1 (or 8). After mbsy goes inactive, state 2 (or 7) is entered. This state prepares the appropriate side for integra- tion. As mentioned above, in the ncont states, the inputs to the DDC112 are grounded. One interesting observation from the state diagram is that the integrations always alternate between sides A and B. This relationship holds for any CONV pattern and is independent of the mode. States 2 and 7 insure this relationship during the ncont mode. When power is first applied to the DDC112, the beginning state is either 1 or 8, depending on the initial level of CONV. For CONV held HIGH at power-up, the beginning state is 1. Conversely, for CONV held LOW at power-up, the beginning state is 8. In general, there is a symmetry in the state diagram between states 1-8, 2-7, 3-6, and 4-5. Inverting CONV results in the states progressing through their sym- metrical match. TIMING EXAMPLES Cont Mode A few timing diagrams will now be discussed to help illustrate the operation of the state machine. These are shown in Figures 10 through 19. Table V gives generalized timing specifications in units of CLK periods. Values in µs for Table V can be easily found for a given CLK. For example, if CLK = 10MHz, then a CLK period = 0.1 µs. t 6 in Table V would then be 479.4 µs. Figure 10 shows a few integration cycles beginning with initial power-up for a cont mode example. The top signal is CONV and is supplied by the user. The next line indicates the current state in the state diagram. The following two traces show when integrations and measurement cycles are under- way. The internal signal mbsy is shown next. Finally, DVALID is given. As described in the data sheet, DVALID goes active LOW when data is ready to be retrieved from the DDC112. It stays LOW until DXMIT is taken LOW by the user. In Figure 10 and the following timing diagrams, it is assumed that DXMIT it taken LOW soon after DVALID goes LOW. The text below the DVALID pulse indicates the side of the data and arrows help match the data to the corresponding integration. The signals shown in Figures 10 through 19 are drawn at approximately the same scale. In Figure 10, the first state is ncont state 1. The DDC112 always powers up in the ncont mode. In this case, the first state is 1 because CONV is initially HIGH. After the first two states, cont mode operation is reached and the states begin toggling between 4 and 5. From now on, the input is being continuously integrated, either by side A or side B. The time needed for the m/r/az cycle, t6, is the same time that |
|
Link URL |
| Does ALLDATASHEET help your business so far? [ DONATE ] |
About Alldatasheet | Advertisement | Contact us | Privacy Policy | Link to Datasheet | Link Exchange | Manufacturer List All Rights Reserved©Alldatasheet.com |
| Russian : Alldatasheetru.com | Korean : Alldatasheet.co.kr | Spanish : Alldatasheet.es | French : Alldatasheet.fr | Italian : Alldatasheetit.com Portuguese : Alldatasheetpt.com | Polish : Alldatasheet.pl | Vietnamese : Alldatasheet.vn Indian : Alldatasheet.in | Mexican : Alldatasheet.com.mx | British : Alldatasheet.co.uk | New Zealand : Alldatasheet.co.nz |
|
Family Site : ic2ic.com |
icmetro.com |