| Electronic Components Datasheet Search |
|
LMP92018 Datasheet(PDF) 18 Page - Texas Instruments |
|
|
|
|||||||||||||||||||||||||||||
LMP92018 Datasheet(HTML) 18 Page - Texas Instruments |
|
18 / 33 page ![]() VDD/2 CHOLD Device Pin + - ROUT< 4k Voltage Source INx Sampling Switch ADATA = INT VINX AREF x 1023 ( ) LMP92018 SNAS514B – NOVEMBER 2011 – REVISED MAY 2013 www.ti.com FUNCTIONAL DESCRIPTION ANALOG SENSE SUBSYSTEM The device is capable of monitoring up to 8 externally applied voltages. The system is centered around a 10-bit SAR ADC fronted by an 8-input mux. Sampling and Conversion The external voltage is sampled onto the internal CHOLD capacitor during the TRACK period, see Figure 13. Once acquired, the stored charge is measured using the Successive Approximation Register (SAR) method. The timing of the internal state machine is governed by the user defined signals CSB and SCLK. The sequence of the events is described in Conversion Sequence. Attention should be paid to the output impedance of the sensed voltage source and the capacitance present at the INx input of the device (which is dominated by CHOLD during TRACK time). The combined circuit's RC limits the bandwidth and settling time of the input signal. At maximum SPI bus data rate, it is recommended to limit the output resistance ROUT of the signal source to assure the accuracy of the conversion. During the HOLD period (duration of t HOLD specified in Electrical Characteristics ) , all mux switches are OFF, and the charge captured on CHOLD is measured to produce an ADC output code. This charge is never lost during the conversion, unless the SCLK is so slow that the charge is lost due to the internal capacitor's leakage. Under normal conditions the charge stored is modified only during TRACK period. Below is a typical ADC output code as a function of input voltage at device pin INx, x=0...7: (1) In the expression above AREF is the reference voltage input to the internal ADC. See INTERNAL VOLTAGE REFERENCE SOURCE. Figure 13. ADC During TRACK Period Sampling Transient As noted in Sampling and Conversion the charge acquired during TRACK period is maintained throughout the conversion process. Since the successive sample operations will involve different input potentials an instantaneous current will flow at the beginning of TRACK period. This always leads to temporary disturbance of the input potential. This current, and resulting disturbance, will vary with the magnitude of the sampled signal and source impedance ROUT, see Figure 13. If ROUT is excessive, and resulting RC time constant of the input circuit too long, the preceding sample may affect the new sample's accuracy. If high ROUT cannot be avoided, another method of improving the acquisitin accuracy is to lengthen the TRACK time. The ADC TRACK time is fully controlled by the user inputs CSB and SCLK, see Figure 14. The time allotted for the CHOLD to settle can be arbitrarily adjusted via the length of the CSB=High period and the frequency of SCLK, subject to limitations on CSB and SCLK timing as shown in Electrical Characteristics . 18 Submit Documentation Feedback Copyright © 2011–2013, Texas Instruments Incorporated Product Folder Links: LMP92018 |
|
Link URL |
| Does ALLDATASHEET help your business so far? [ DONATE ] |
About Alldatasheet | Advertisement | Contact us | Privacy Policy | Link to Datasheet | Link Exchange | Manufacturer List All Rights Reserved©Alldatasheet.com |
| Russian : Alldatasheetru.com | Korean : Alldatasheet.co.kr | Spanish : Alldatasheet.es | French : Alldatasheet.fr | Italian : Alldatasheetit.com Portuguese : Alldatasheetpt.com | Polish : Alldatasheet.pl | Vietnamese : Alldatasheet.vn Indian : Alldatasheet.in | Mexican : Alldatasheet.com.mx | British : Alldatasheet.co.uk | New Zealand : Alldatasheet.co.nz |
|
Family Site : ic2ic.com |
icmetro.com |