| Electronic Components Datasheet Search |
|
RM4301ASEA Datasheet(PDF) 8 Page - Sames |
|
|
|||||||||||||||||||||||||||||
RM4301ASEA Datasheet(HTML) 8 Page - Sames |
|
8 / 19 page ![]() http://www.sames.co.za 8/19 PRELIMINARY RM4301ASEA equation(9): fCI,-3dB ≈ 14.1kHz (acceptable) equation(12): RX = 200kW equation(13): choose RX0 = RX1 = 62k W and obtain RX2 ≈ 47k W equation(14): RX3 = 30k W equation(15): RX4 = 15k W, RX5 = 7.5kW, RX6 = 3.9kW, RX7 = 2k W, RX8 = 1kW, RX9 = 470W, RX10 = 240 W, and RX11 = 120W. Some ratios are not entirely accurate, but to ensure low cost it is important to use only standard resistor values. equation(16): using IVP = 11 obtain DF_LED ≈ 392 equation(17): DF_MO = 8 Table 2: FMS = '1', RB = 'Z', RA = '0' MEASURING THE PHASE SHIFT OF CURRENT TRANSFORMERS The SA4301A derives the input current on the current sense networks directly from the current transformers. For this reason the actual phase shift added by the current transformer is usually less than the manufacturers specification. It is therefore advisable to measure the phase shift in application on a small sample of CTs. The best method to use is: 1. Design and implement the circuit using the procedure described. Assume ½ the manufactures specification for the phase shift of the CT when calculating the component values. 2. When assembling the PCB do not place the capacitors on the voltage sense networks. 3. Calibrate the meter at unity power factor using the procedure described in the “Calibrating the Meter” section. Ensure the error is as close to zero as possible. 4. Measure the error at power factor 0.5 lag and 0.5 lead for each phase individually. Ensure that the error is positive for 0.5 lag and negative for 0.5 lead. If this is not the case the phase shift of the CTs is too large or the cut-off frequency of the anti-alias filters on the current input networks is too high. 5. Obtain the average of the absolute values of the errors at 0.5 lag and 0.5 lead on all phases. 6. Using the result from step 5 calculate the overall phase shift of the current sensing network. This value is the phase shift of both the current transformer and the anti- alias filter combined and is equal to the required phase shift for the voltage sensing network: ÷÷ ø ö çç è æ ÷ ø ö ç è æ - ´ - = f + f = f 100 Error % 1 5 . 0 arccos 60o CT II IV (18) 7. Given the theoretical value of the current input network phase shift from equation (6) the value of fCT can be calculated. 8. Recalculate RX12 and RX13 and modify the PCB. Also add the voltage network compensation capacitors. 9. Recalibrate the meter and verify the performance at non- unity power factor. CALIBRATING THE METER The RM4301ASEA is calibrated by means of a resistive ladder on the voltage sensing networks. The nine resistors can be chosen to represent any desired calibration range. The calibration accuracy can be extended by adding resistors to the ladder network. Soldering a jumper in parallel with a resistor closed will remove that resistor from the voltage divider network thereby providing a larger input current to the SA4301A and so increasing the output energy. The RM4301ASEA should be calibrated phase by phase with all three mains voltages present at all times. Each phase can be calibrated by first short circuiting resistor RX3. If the error is now positive a larger resistance is required so the jumper across RX3 is opened before proceeding to the next resistor in the network (RX4). If the error is negative then the process is simply continued with the next resistor. These steps are repeated for all nine resistors in the ladder network. The SA4301A is linear over the dynamic range required by the IEC62053-21 specification, so calibration is only required at one current value. Typically the basic current (Ib) is chosen as the calibration point. The repeatability of error measurements at Ib is typically better than 0.1% so the error of the meter can typically be measured accurately by a single integration of a very small number of pulses. PCB CONNECTIONS The three CTs for phases 1 to 3 are connected to JA11A / JA11B, JB11A / JB11B and JC11A / JC11B respectively. The current transformers should be connected such that a positive current flows into JA11B, JB11B and JC11B when forward energy is applied to the meter. The three mains voltages should be connected to JA1, JB1 and JC1 respectively while the NEUTRAL line must be connected to J1. The opto-isolator output should be connectd to J2 while the stepper motor or impulse counter is connected to J3. JUMPER OPTIONS The RM4301ASEA meter is equipped with several solderable selectors, which allow the meter to be set up according to the required specifications. Table 3 describes the functionality of the various jumpers. When working on the meter care should be taken to avoid electric shock due to the high voltages present. |
|
|
Link URL |
| Does ALLDATASHEET help your business so far? [ DONATE ] |
About Alldatasheet | Advertisement | Contact us | Privacy Policy | Link to Datasheet | Link Exchange | Manufacturer List All Rights Reserved©Alldatasheet.com |
| Russian : Alldatasheetru.com | Korean : Alldatasheet.co.kr | Spanish : Alldatasheet.es | French : Alldatasheet.fr | Italian : Alldatasheetit.com Portuguese : Alldatasheetpt.com | Polish : Alldatasheet.pl | Vietnamese : Alldatasheet.vn Indian : Alldatasheet.in | Mexican : Alldatasheet.com.mx | British : Alldatasheet.co.uk | New Zealand : Alldatasheet.co.nz |
|
Family Site : ic2ic.com |
icmetro.com |