| Electronic Components Datasheet Search |
|
SC120 Datasheet(PDF) 15 Page - Semtech Corporation |
|
|
|||||||||||||||||||||||||||||
SC120 Datasheet(HTML) 15 Page - Semtech Corporation |
|
15 / 21 page ![]() PRELIMINARY SC120 15 Applications Information (continued) VOUT +0.8% +1.8% PSAVE Mode at Moderate Load PWM Mode at High Load -2% BURST OFF (> 5μs) Higher Load Applied 0A Inductor Current Time Prog’d Voltage BURST PWM Mode PSAVE exit due to off-time reduction 240mA OFF (< 5μs) Figure 3 — PSAVE Operation With Exit to PWM Due To Off-time < 5μs V OUT < 0.98 × V REG , PWM operation will resume. The second PSAVE exit criterion, illustrated in Figure 3, depends on the rate of discharge of the output capacitor between PSAVE bursts. If the time between bursts is less than 5μs, then PWM operation resumes. The output capacitance value will affect the second criterion, but not the first. Reducing the output capacitor will reduce the output load at which PSAVE mode exits to PWM mode. Within each on/off cycle of a PSAVE burst, the rate of decrease of the inductor current during the off-state is proportional to (V OUT − V IN ). If V IN is sufficiently close to V OUT , the decrease in current during the off-state may not over- come the increase in current during the minimum on-time of the on-state, approximately 100ns. This can result in the peak inductor current rising above the PSAVE mode n-channel FET current limit. (Normally, when the n-channel FET current limit is reached, the on-state ends immediately and the off-state begins. This sets the duty cycle on a cycle-by-cycle basis.) This inductor current rise accumulates with each successive cycle in the burst. The result is that the output load current that can be sup- ported in PSAVE under this high V IN condition will be greater than occurs if the 240mA current limit can be enforced. Therefore the PSAVE exit load due to the first exit criterion (Figure 2) can increase significantly. This phenomenon is advantageous. Reverting to PWM opera- tion with high V IN can result in V OUT rising above V REG , due to the PWM minimum duty cycle. PSAVE operation avoids this voltage rise because of its voltage-threshold on/off control. If the load remains low enough to remain in PSAVE, V IN can approach and even slightly exceed V OUT . To initally enter PSAVE mode, the initial startup load must be small enough to cause discontinuous mode PWM opera- tion. This PSAVE mode startup load upper limit can be increased if needed by reducing the inductance (refer to the section Inductor Selection). Sufficiently large output capacitance will prevent PSAVE exit due to the second exit criterion (Figure 3). PSAVE V OUT ripple may increase due to parasitic capaci- tance on the external FB pin network. If using external feedback programming, it is prudent to add a small capaci- tor between OUT and FB to the circuit board layout. When operating the SC120 in the final configuration in PSAVE, observe the amplitude of PSAVE ripple. If the ripple exceeds 50mV for the expected range of input voltage, a small-value capacitor should be tried. Capacitance on the order of a few picofarads is often sufficient to bring the ripple amplitude to approximately 50mV. |
|
|
Link URL |
| Does ALLDATASHEET help your business so far? [ DONATE ] |
About Alldatasheet | Advertisement | Contact us | Privacy Policy | Link to Datasheet | Link Exchange | Manufacturer List All Rights Reserved©Alldatasheet.com |
| Russian : Alldatasheetru.com | Korean : Alldatasheet.co.kr | Spanish : Alldatasheet.es | French : Alldatasheet.fr | Italian : Alldatasheetit.com Portuguese : Alldatasheetpt.com | Polish : Alldatasheet.pl | Vietnamese : Alldatasheet.vn Indian : Alldatasheet.in | Mexican : Alldatasheet.com.mx | British : Alldatasheet.co.uk | New Zealand : Alldatasheet.co.nz |
|
Family Site : ic2ic.com |
icmetro.com |