| Electronic Components Datasheet Search |
|
TGP-751 Datasheet(PDF) 14 Page - List of Unclassifed Manufacturers |
|
|
|||||||||||||||||||||||||||||
TGP-751 Datasheet(HTML) 14 Page - List of Unclassifed Manufacturers |
|
14 / 35 page ![]() Micropelt - preliminary - Datasheet TE-CORE /RF v1.4 | Page 14 Thermoharvesting Wireless Sensor System Micropelt TE-CORE /RF 3.2 Wireless Sensor module The TE-Power CORE /RF Wireless Sensor module runs exclusively on the power supplied by the TGP thermo- generator. It’s purpose is to collect data from the tem- perature sensor, TGP output voltage and storage ca- pacitor voltage and transmit those in an energy effi- cient manner wireless to the associated RF USB receiv- er. A pre-qualified ETSI EN 300 440-2 V1.4.1. ,iM222A Zigbee Network Processor of IMST, operating in 2.4 GHz ISM band is used, based on TI‘s CC2530 SoC. 3.2.1 Radio Transceiver & Protocol The RF transceiver operates in ISM channel 11 = 2.462 GHz, RF power: +4.5dBm, data rate: 250 kBaud. The total active cycle includes one temperature and two voltage measurements, protocol preparation (14 bytes) and uni-directional point-to-point RF transmis- sion; all done within 3.6 msec. The net “on-air” time is less than 1 msec and the duty cycle is 2 seconds. The Byte assignment (value) is: CORE Adress: Byte 1 and 2=Transmitter address (1… 65636); TGP cold side temperature: Byte 3 =Tcold low byte; Byte 4 =Tcold high byte; Voltage at storage capacitor: Byte 5 =Ucap low byte; Byte 6 =Ucap high byte; TGP open circuit voltage: Byte 7 =UTGP_OCV low byte; Byte 8=UTGP_OCV high byte; DC-DC Booster input voltage: Byte 9 =UTGP low byte; Byte 10=UTGP high byte; Sum Byte 1 + Byte 2 + … + Byte 10: Byte 11 Checksum low byte; Byte 12 Checksum high byte; Data terminator / end character: Byte 13 -CR; Byte 14 - LF; 3.2.2 Signal processing & Radio The following figure presents the signal processing and measurement time and energy consumption for one operation cycle. The operation cycle contains three actions: Point A: Microcontroller wakes-up, from sleep mode, after which the measurement of the temperature sensor TMP102 is started and the storage capacitor voltage is being measured. Also the TGP OCV (open circuit voltage) measurement circuit is activated. Point B: Open circuit voltage of the TGP is being measured and the related measurement circuit deactivated. Point C: The temperature is being measured by TMP102. Radio is activated and data is broadcasted. The total operating time of the system is 3.6 msec. With a duty cycle of 2 seconds, the energy consump- tion is: Iaverage= IA×tA + IB×tB + IC×tC = = (10mA×1ms + 6mA×0.85ms + (36.8mA×1ms + + 25mA×0.75ms)) / 2sec Iaverage = 35.3 µAsec Paverage = IaverageUsupply Paverage = 35.3 µA sec 2.45 V = 86.5 µWsec Timing and Current consumption for one operation cycle A B C Data sampling TMP102 IO is high |
|
Link URL |
| Does ALLDATASHEET help your business so far? [ DONATE ] |
About Alldatasheet | Advertisement | Contact us | Privacy Policy | Link to Datasheet | Link Exchange | Manufacturer List All Rights Reserved©Alldatasheet.com |
| Russian : Alldatasheetru.com | Korean : Alldatasheet.co.kr | Spanish : Alldatasheet.es | French : Alldatasheet.fr | Italian : Alldatasheetit.com Portuguese : Alldatasheetpt.com | Polish : Alldatasheet.pl | Vietnamese : Alldatasheet.vn Indian : Alldatasheet.in | Mexican : Alldatasheet.com.mx | British : Alldatasheet.co.uk | New Zealand : Alldatasheet.co.nz |
|
Family Site : ic2ic.com |
icmetro.com |