| Electronic Components Datasheet Search |
|
DRA752ABC Datasheet(PDF) 187 Page - Texas Instruments |
|
|
|||||||||||||||||||||||||||||
DRA752ABC Datasheet(HTML) 187 Page - Texas Instruments |
|
187 / 443 page ![]() 187 DRA756, DRA755, DRA754, DRA752 DRA751, DRA750, DRA746, DRA745, DRA744 www.ti.com SPRS950F – DECEMBER 2015 – REVISED MAY 2019 Submit Documentation Feedback Product Folder Links: DRA756 DRA755 DRA754 DRA752 DRA751 DRA750 DRA746 DRA745 DRA744 Specifications Copyright © 2015–2019, Texas Instruments Incorporated (2) Terminology: – VOPR MIN = Minimum Operational Voltage level that ensures device functionality and specified performance in Section 5.4, Recommended Operating Conditions table. – VOFF = OFF Voltage level is defined to be less than 0.6 V, where any current draw has no impact to POH. – Ramp Down = transition time from VOPR MIN to VOFF and is slew rate independent. (3) General timing diagram items: – Grey shaded areas show valid transition times for supplies between VOPR MIN and VOFF. – Dashed vertical lines show approximate elapse times based upon TI recommended PMIC power-down sequencer circuit performance. (4) porz and rtc_porz must be asserted low for 100 μs min to ensure SoC is set to a safe functional state before any voltage begins to ramp down. – Only if using RTC-mode with an independent RTC input power source, then rtc_porz can remain high and RTC-domains (vdd_rtc, vdda_rtc, and vddshv5) can remain energized while all other domains sourced from the system input power are powered down. (5) vddshv[1-7, 9-11] domains supplied by 3.3 V: – must remain greater than 2.7 V to enable Dual Voltage GPIO selector circuit operation for 100 μs min, after porz is asserted low. – must not exceed vdds18v voltage level by more than 2 V during ramp down, until vdds18v drops below VOFF (0.6 V). (6) vddshv[1-7, 9-11] domains supplied by 1.8 V must ramp down concurrently with vdds18v and be sourced from common vdds18v supply. (7) vddshv8 supporting SD Card: – must be in first group of supplies to ramp down after porz has been asserted low for 100 µs min. – must be sourced from independent power resource that can provide dual voltage (3.3 V / 1.8 V) operation as required to be compliant to SDIO specification. – if SDIO operation is not needed, must be grouped with other vddshv[1-7, 9-11] domains. (8) vdda33v_usb[1-2] domains must be in first group of supplies to ramp down after porz has been asserted low for 100 µs min. (9) vdd_dspeve, vdd_gpu, vdd_iva, vdd_mpu, vdd, vdd_rtc, vdds_ddr1, vdda_* domains can all start to ramp down in any order after 100 µs low assertion of porz. (10) vdds_ddr1 domains: – can remain at VOPR MIN or a level greater than vdds18v during ramp down. – elapsed time from vdds18v dropping below 1.0 V to vdds_ddr[1-3] dropping below 0.6 V must not exceed 10 ms. (11) vdda_* domains: – can start to ramp down before or concurrently with vdds18v. – must not exceed vdds18v voltage level after vdds18v drops below 1.62 V until vdds18v drops below VOFF (0.6 V). (12) vdds18v domain should maintain a minimum level of 1.62 V (VNOM – 10%) until vdd_dspeve and vdd start to ramp down. |
|
Link URL |
| Does ALLDATASHEET help your business so far? [ DONATE ] |
About Alldatasheet | Advertisement | Contact us | Privacy Policy | Link to Datasheet | Link Exchange | Manufacturer List All Rights Reserved©Alldatasheet.com |
| Russian : Alldatasheetru.com | Korean : Alldatasheet.co.kr | Spanish : Alldatasheet.es | French : Alldatasheet.fr | Italian : Alldatasheetit.com Portuguese : Alldatasheetpt.com | Polish : Alldatasheet.pl | Vietnamese : Alldatasheet.vn Indian : Alldatasheet.in | Mexican : Alldatasheet.com.mx | British : Alldatasheet.co.uk | New Zealand : Alldatasheet.co.nz |
|
Family Site : ic2ic.com |
icmetro.com |