| Electronic Components Datasheet Search |
|
PM7340 Datasheet(PDF) 93 Page - PMC-Sierra, Inc |
|
|
|||||||||||||||||||||||||||||
PM7340 Datasheet(HTML) 93 Page - PMC-Sierra, Inc |
|
93 / 334 page ![]() PRELIMINARY INVERSE MULTIPLEXING OVER ATM PM7340 S/UNI-IMA-8 DATA SHEET PMC-2001723 ISSUE 3 INVERSE MULTIPLEXING OVER ATM PROPRIETARY AND CONFIDENTIAL TO PMC-SIERRA, INC., AND FOR ITS CUSTOMERS’ INTERNAL USE 76 10.2.5.3 Removing accumulated delay In some situations, removal of accumulated delay may be desired. This usually occurs after a group has been operational for a period of time and the link characteristics in terms of transport delay have changed. The adjust_delay command is provided to remove delay from the group. The execution of this command will effect the CDV of the group while the delay is reduced. Any delay adjustment to the group will also effect the CDV of a connection carried on that group. This is additive, if 20 ms of delay is removed from the group, a particular connection within the group will experience an additional 20 ms of CDV. This will generally only be a concern to CBR or VBR-rt traffic flows. This increase in CDV may cause traffic to be policed out or real time applications to experience slips. To minimize the effect on the group traffic rate, while the delay is being reduced, the ATM cells from the group will be transferred to the ATM layer at a rate of (1+1/16)*IDCR versus IDCR. In other words, the group will playout data 6.25% faster to the ATM layer during the process of delay reduction. The amount of time the delay removal takes depends upon the amount of delay to be removed. For example, a group where 200 ms of delay is to be removed takes approximately 3 seconds for the process to complete. While delay adjustments are being made to a group, new links can not be added and links can not be recovered from an error state. The S/UNI-IMA-8 will reject any requests to start a LASR procedure. However, while delay adjustments are in progress, links can be deleted or made unusable. 10.2.5.4 Group Start-up Procedure When the Add_Group Command is issued, the Group state machine will enter the start-up state and start to send IMA frames on the configured Tx links. 10.2.5.4.1 Start-up State While in the start-up state, the configured tx link state machines will be reporting the Unusable state and the rx-link state machines will be reporting Not_In_Group. At this point, the S/UNI-IMA-8 will start to monitor the incoming ICP cells. When ICP cells are received with the FE indicating that the Group is in Start-up, the S/UNI-IMA-8 will transition to the Start-up-Ack state if the M value, the Group Symmetry, the OAM Label and IMA_ID (optional) values are acceptable. Otherwise, the S/UNI-IMA-8 will transition into the Config-Aborted State. |
|
Link URL |
| Does ALLDATASHEET help your business so far? [ DONATE ] |
About Alldatasheet | Advertisement | Contact us | Privacy Policy | Link to Datasheet | Link Exchange | Manufacturer List All Rights Reserved©Alldatasheet.com |
| Russian : Alldatasheetru.com | Korean : Alldatasheet.co.kr | Spanish : Alldatasheet.es | French : Alldatasheet.fr | Italian : Alldatasheetit.com Portuguese : Alldatasheetpt.com | Polish : Alldatasheet.pl | Vietnamese : Alldatasheet.vn Indian : Alldatasheet.in | Mexican : Alldatasheet.com.mx | British : Alldatasheet.co.uk | New Zealand : Alldatasheet.co.nz |
|
Family Site : ic2ic.com |
icmetro.com |