| Electronic Components Datasheet Search |
|
PM8621 Datasheet(PDF) 163 Page - PMC-Sierra, Inc |
|
|
|||||||||||||||||||||||||||||
PM8621 Datasheet(HTML) 163 Page - PMC-Sierra, Inc |
|
163 / 184 page ![]() NSE-8G™ Standard Product Data Sheet Preliminary Proprietary and Confidential to PMC-Sierra, Inc., and for its Customers’ Internal Use 162 Document ID: PMC-2010850, Issue 1 Figure 33 Relabeled Graph A B C D E F 1 2 3 4 5 6 12.13.5 Experimental Results The performance of PMC-Sierra’s Open Path Algorithm has been studied by implementing it in C++ and running extensive random connection tests. Tests for NSE/SBS applications of this algorithm used a single NSE-8G connected to 12 SBSs, each carrying a full complement of DS0 connection. Many runs were completed in which an initially unloaded switch is presented with a sequence of random call establishment requests up to the point of 100% switching loads. These runs were carried out on a 600 MHz Alpha running Linux. In all of these runs, no otctet open path search took longer than 10 µs, thus supporting up to 100,000 1 DS0 call establishments per second. T1s and other aggregates require the establishment of multiple octet open paths; complete T1s can be established at about 3,700 T1/sec. The reasons for this surprisingly good performance are explained in the separate open path algorithm document. It is our opinion that these rates are sufficiently high that the call establishment algorithm should not be a bottleneck in any application of the NSE/SBS, and that this rate is sufficiently high to permit the NSE/SBS to be used for PSTN call establishment rates (up to 100,000 calls/sec in a switch supporting 96,768 full-duplex calls, with the switching core implemented in 1 NSE-8G and 12 SBS chips). 12.13.6 Multicast Scheduling general multicast connections is an entirely different class of problem. With unrestricted multicast, the underlying architecture is non-blocking up to capacity dictated by the number of slots in a frame, but finding the non-blocking schedule is NP-hard. There is no polynomial time running algorithm known to solve this class of problem. There are two approaches to solving the multicast problem: • Heuristic algorithms that have statistical probability of success for simple versions of the problem; (and) • Restricted multicast, where the form of restriction provides a means to solve the scheduling problem. 1 This ignores inband or uP to NSE limitations. |
|
Link URL |
| Does ALLDATASHEET help your business so far? [ DONATE ] |
About Alldatasheet | Advertisement | Contact us | Privacy Policy | Link to Datasheet | Link Exchange | Manufacturer List All Rights Reserved©Alldatasheet.com |
| Russian : Alldatasheetru.com | Korean : Alldatasheet.co.kr | Spanish : Alldatasheet.es | French : Alldatasheet.fr | Italian : Alldatasheetit.com Portuguese : Alldatasheetpt.com | Polish : Alldatasheet.pl | Vietnamese : Alldatasheet.vn Indian : Alldatasheet.in | Mexican : Alldatasheet.com.mx | British : Alldatasheet.co.uk | New Zealand : Alldatasheet.co.nz |
|
Family Site : ic2ic.com |
icmetro.com |