| Electronic Components Datasheet Search |
|
P5021 Datasheet(PDF) 65 Page - NXP Semiconductors |
|
|
|||||||||||||||||||||||||||||
P5021 Datasheet(HTML) 65 Page - NXP Semiconductors |
|
65 / 155 page ![]() Electrical characteristics P5021 QorIQ Integrated Processor Data Sheet, Rev. 1 Freescale Semiconductor 65 2.6.3 Real time clock timing The real time clock timing (RTC) input is sampled by the platform clock. The output of the sampling latch is then used as an input to the counters of the MPIC and the time base unit of the core; there is no need for jitter specification. The minimum pulse width of the RTC signal should be greater than 16 × the period of the platform clock with a 50% duty cycle. There is no minimum RTC frequency; RTC may be grounded if not needed. 2.6.4 dTSEC gigabit Ethernet reference clock timing This table provides the dTSEC gigabit Ethernet reference clocks AC timing specifications. 2.6.5 Other input clocks A description of the overall clocking of this device is available in the applicable chip reference manual in the form of a clock subsystem block diagram. For information on the input clock requirements of functional blocks sourced external of the device, such as SerDes, Ethernet Management, eSDHC, Local bus, see the specific interface section. 2.7 RESET initialization This section describes the AC electrical specifications for the RESET initialization timing requirements. This table provides the RESET initialization AC timing specifications. Table 14. EC_GTX_CLK125 AC timing specifications Parameter/Condition Symbol Min Typical Max Unit Notes EC_GTX_CLK125 frequency tG125 —125 — MHz — EC_GTX_CLK125 cycle time tG125 —8 — ns — EC_GTX_CLK125 rise and fall time LVDD = 2.5 V LVDD = 3.3 V tG125R/tG125F —— 0.75 1.0 ns 1 EC_GTX_CLK125 duty cycle 1000Base-T for RGMII tG125H/tG125 47 — 53 %2 EC_GTX_CLK125 jitter — — — ± 150 ps 2 Note: 1. Rise and fall times for EC_GTX_CLK125 are measured from 20% to 80% (rise time) and 80% to 20% (fall time) of LVDD. 2. EC_GTX_CLK125 is used to generate the GTX clock for the dTSEC transmitter with 2% degradation. EC_GTX_CLK125 duty cycle can be loosened from 47%/53% as long as the PHY device can tolerate the duty cycle generated by the dTSEC GTX_CLK. See Section 2.12.2.3, “RGMII AC timing specifications,” for duty cycle for 10Base-T and 100Base-T reference clock. Table 15. RESET initialization timing specifications Parameter Min Max Unit1 Notes Required assertion time of PORESET 1— ms 3 Required input assertion time of HRESET 32 — SYSCLKs 1, 2 Input setup time for POR configurations with respect to negation of PORESET 4 — SYSCLKs 1 |
|
Link URL |
| Does ALLDATASHEET help your business so far? [ DONATE ] |
About Alldatasheet | Advertisement | Contact us | Privacy Policy | Link to Datasheet | Link Exchange | Manufacturer List All Rights Reserved©Alldatasheet.com |
| Russian : Alldatasheetru.com | Korean : Alldatasheet.co.kr | Spanish : Alldatasheet.es | French : Alldatasheet.fr | Italian : Alldatasheetit.com Portuguese : Alldatasheetpt.com | Polish : Alldatasheet.pl | Vietnamese : Alldatasheet.vn Indian : Alldatasheet.in | Mexican : Alldatasheet.com.mx | British : Alldatasheet.co.uk | New Zealand : Alldatasheet.co.nz |
|
Family Site : ic2ic.com |
icmetro.com |