| Electronic Components Datasheet Search |
|
F39-LSGA Datasheet(PDF) 90 Page - Omron Electronics LLC |
|
|
|||||||||||||||||||||||||||||
F39-LSGA Datasheet(HTML) 90 Page - Omron Electronics LLC |
|
90 / 109 page ![]() Common to F3SG-SR and F3SG-PG 90 Double Break with EDM [Wiring Example] Note: For the functional earth connection, refer to page 83. F3SG-SRA Available F3SG-PGA-A/-L Not available F3SG-SRB Available F3SG-PGA-C Not available F39-JG C-L F39-JGR3K-D F39-JG A-D 24 VDC Wiring for NPN *1 24 VDC KM1 KM2 S2 S3 S1 0 VDC KM1 KM2 *4 IN PLC *3 KM1 KM2 M Cam S3 S1: Test switch S2: Reset switch S3: Press position switch KM1, KM2: Safety relay with forcibly guided contacts (G7SA) or magnetic contactor PLC: Programmable logic controller (Used for monitoring only. NOT related to safety system.) M: Motor Timing chart Reset switch (S2) Press position switch (S3) OSSD T1 min. T2 min. T4 min. T5 min. T5 min. T2 min. T3 min. T4 min. T3 min. Dummy break T1 min. T2 min. T3 min. T4 min. T6 Machine stops Machine restarts Feeding parts Feeding parts Removing parts Unintended block Dummy break * Dummy break * Unblocked Blocked T1: Minimum pressing time of reset switch. Configurable from 100 to 500 ms in 100-ms increments by SD Manager 3. T2: Minimum break time (300 ms) T3: Minimum unblocked time during the time from removing to feeding parts. T3 = T1 T4: Minimum break time (300 ms) T5: Minimum pressing time of press position switch. T5 = T1 T6: Wait time until double break is complete (30 s or less) * When the machine is stopped by unintended block in the middle of pressing of parts, operation of the reset switch (S1) and then double dummy break are needed for reinitiation of the machine cycle. Intelligent Tap Needed Function Setting DIP switch SD Manager 3 EDM - [External device monitoring] : Enable *5 Operating Range Selection Short : Connect the OPERATING RANGE SELECT INPUT line of the emitter to 0 VDC. PSDI N/A [PSDI] : Double break *5 Non-Muting system Perform wiring according to the wiring diagram. N/A [Muting] : Disable *5 External Test used Connect the TEST line of the emitter to 24V/0V of the emitter via a test switch (NO contact). *6 N/A [External test signal inversion] : Disable Optical Synchronization Do not connect the COM(+) and COM(-) lines of the of emitter and receiver with each other. *1. Reverse the polarity of the power supply when using in the NPN system. Select a PLC of PNP or NPN type according to the system of your application. *2. Open or connect the line to 24 VDC if Operating Range Selection is used in Long Mode. *3. When connecting to the PLC, the output mode must be changed with the SD Manager 3 according to your application. For the setting this function, refer to the User's Manual (Man.No.Z405). *4. This is the case for a PELV circuit. *5. Set the function with the SD Manager 3, restore the settings to the F3SG-SR/PG, and perform wiring according to the wiring diagram. *6. This wiring example shows light emission stop when connected to 24 VDC with PNP setting, and light emission stop when connected to 0 VDC with NPN setting. If TEST switch is not needed, refer to the User's Manual (Man. No. Z405). |
|
Link URL |
| Does ALLDATASHEET help your business so far? [ DONATE ] |
About Alldatasheet | Advertisement | Contact us | Privacy Policy | Link to Datasheet | Link Exchange | Manufacturer List All Rights Reserved©Alldatasheet.com |
| Russian : Alldatasheetru.com | Korean : Alldatasheet.co.kr | Spanish : Alldatasheet.es | French : Alldatasheet.fr | Italian : Alldatasheetit.com Portuguese : Alldatasheetpt.com | Polish : Alldatasheet.pl | Vietnamese : Alldatasheet.vn Indian : Alldatasheet.in | Mexican : Alldatasheet.com.mx | British : Alldatasheet.co.uk | New Zealand : Alldatasheet.co.nz |
|
Family Site : ic2ic.com |
icmetro.com |