| Electronic Components Datasheet Search |
|
M68HC08 Datasheet(PDF) 81 Page - Freescale Semiconductor, Inc |
|
|
|||||||||||||||||||||||||||||
M68HC08 Datasheet(HTML) 81 Page - Freescale Semiconductor, Inc |
|
81 / 188 page ![]() Internal Clock Generator Module (ICG) Usage Notes MC68HC908RF2 — Rev. 4.0 Data Sheet MOTOROLA Internal Clock Generator Module (ICG) 81 6.4.6 Nominal Frequency Settling Time Because the clock period of the internal clock (ICLK) is dependent on the digital loop filter outputs (DDIV and DSTG) which cannot change instantaneously, ICLK will temporarily operate at an incorrect clock period when any of the operating condition changes. This happens whenever the part is reset, the ICG multiply factor (N) is changed, the ICG trim factor (TRIM) is changed, or the internal clock is enabled after inactivity (STOP or disabled operation). The time that the ICLK takes to adjust to the correct period is known as the settling time. Settling time depends primarily on how many corrections it takes to change the clock period, and the period of each correction. Since the corrections require four periods of the low-frequency base clock (4*tIBASE), and since ICLK is N (the ICG multiply factor for the desired frequency) times faster than IBASE, each correction takes 4*N*tICLK. The period of ICLK, however, will vary as the corrections occur. 6.4.6.1 Settling to Within 15 Percent When the error is greater than 15 percent, the filter takes eight corrections to double or halve the clock period. Due to how the DCO increases or decreases the clock period, the total period of these eight corrections is approximately 11 times the period of the fastest correction. (If the corrections were perfectly linear, the total period would be 11.5 times the minimum period; however, the ring must be slightly non-linear.) Therefore, the total time it takes to double or halve the clock period is 44*N*tICLKFAST. If the clock period needs more than doubled or halved, the same relationship applies, only for each time the clock period needs doubled, the total number of cycles doubles. That is, when transitioning from fast to slow: • Going from the initial speed to half speed takes 44*N*tICLKFAST • From half speed to quarter speed takes 88*N*tICLKFAST • Going from quarter speed to eighth speed takes 176*N*tICLKFAST, and so on. This series can be expressed as (2x–1)*44*N*tICLKFAST, where x is the number of times the speed needs doubled or halved. Since 2x happens to be equal to tICLKSLOW/tICLKFAST, the equation reduces to 44*N*(tICLKSLOW-tICLKFAST). Note that increasing speed takes much longer than decreasing speed since N is higher. This can be expressed in terms of the initial clock period (t1) minus the final clock period (t2) as such: t 15 abs 44N t 1 t 2 – () [] = Freescale Semiconductor, Inc. For More Information On This Product, Go to: www.freescale.com |
|
Link URL |
| Does ALLDATASHEET help your business so far? [ DONATE ] |
About Alldatasheet | Advertisement | Contact us | Privacy Policy | Link to Datasheet | Link Exchange | Manufacturer List All Rights Reserved©Alldatasheet.com |
| Russian : Alldatasheetru.com | Korean : Alldatasheet.co.kr | Spanish : Alldatasheet.es | French : Alldatasheet.fr | Italian : Alldatasheetit.com Portuguese : Alldatasheetpt.com | Polish : Alldatasheet.pl | Vietnamese : Alldatasheet.vn Indian : Alldatasheet.in | Mexican : Alldatasheet.com.mx | British : Alldatasheet.co.uk | New Zealand : Alldatasheet.co.nz |
|
Family Site : ic2ic.com |
icmetro.com |