| Electronic Components Datasheet Search |
|
MAC7200 Datasheet(PDF) 849 Page - Freescale Semiconductor, Inc |
|
|
|||||||||||||||||||||||||||||
MAC7200 Datasheet(HTML) 849 Page - Freescale Semiconductor, Inc |
|
849 / 976 page ![]() Functional Description MAC7200 Microcontroller Family Reference Manual, Rev. 2 Freescale Semiconductor 771 Phase 1: Synchronize external triggers If chip- external triggers are used to start conversions these triggers must be synchronized to the system clock which takes two system clock cycles. Refer to Section 33.10.2.2, “ATD External Trigger Channel Register (ATDETRIGCH),” for details about how to set external triggers. If chip-internal triggers or no triggers are used then this phase will be skipped. Phase 2: Conversion startup Phase two can not be skipped as it is always required. It reflects the conversion startup phase. Phase 3: Predischarge channel There is the possibility to predischarge the sample capacitor including the parasitic capacity of an ATD channel. For further details please See 33.11.7 Conversions Using Predischarge. This phase is optional and will be skipped if the predischarge feature is not used. Phase 4: Sample channel During this phase the sample capacitor is charged with the voltage applied to the channel that should be converted. This phase can not be skipped. But there is the possibility to set different sampling lengths. Phase 5: Convert channel During this phase the voltage at the sample capacitor is converted and a raw conversion result is generated. The duration of this phase is independent of the result resolution. This phase can not be skipped. Phase 6: Adjust result & conversion shutdown The raw conversion result can be adjusted to decrease the total unadjusted error (TUE). This adjustment will take 6 system clock cycles. This phase is optional and will be skipped if the result adjustment feature is not used. In parallel and independent to the result adjustment the conversion is shutdown. This will take half an ATD clock cycle. The duration of this phase depends on what lasts longer: the result adjustment (if not skipped) or the conversion shutdown. Phase 7: Conversion processing Between phase #1 and phase #6 there are additional system clock cycles needed which have no mentionable meaning. To keep Figure 33.11.6 simple and to provide the full picture all these clock cycles have been summed up to phase #7. Duration of a conversion The duration of a conversion can easily be calculated by summing up the number of clock cycles needed for the executed phases. The following example shows the calculation for one of the longest possible conversions: 1. External triggering selected: 2 SYS 2. Conversion startup: 0.5 ATD |
|
Link URL |
| Does ALLDATASHEET help your business so far? [ DONATE ] |
About Alldatasheet | Advertisement | Contact us | Privacy Policy | Link to Datasheet | Link Exchange | Manufacturer List All Rights Reserved©Alldatasheet.com |
| Russian : Alldatasheetru.com | Korean : Alldatasheet.co.kr | Spanish : Alldatasheet.es | French : Alldatasheet.fr | Italian : Alldatasheetit.com Portuguese : Alldatasheetpt.com | Polish : Alldatasheet.pl | Vietnamese : Alldatasheet.vn Indian : Alldatasheet.in | Mexican : Alldatasheet.com.mx | British : Alldatasheet.co.uk | New Zealand : Alldatasheet.co.nz |
|
Family Site : ic2ic.com |
icmetro.com |