| Electronic Components Datasheet Search |
|
GS3590 Datasheet(PDF) 71 Page - Semtech Corporation |
|
|
|||||||||||||||||||||||||||||
GS3590 Datasheet(HTML) 71 Page - Semtech Corporation |
|
71 / 118 page ![]() GS3590 Final Data Sheet Rev.4 PDS-061414 September 2017 71 of 118 Semtech Proprietary & Confidential www.semtech.com 3. Write the Data Word to be written to the next register in Auto Increment mode, etc. Read access is the same as the above with the exception of step 1, where the Command Word 1 is set for read access (R/W = 1). Note: The UNIT ADDRESS field of Command Word 1 must always match DEV_UNIT_ADDRESS for an access to be accepted by the device. Changing DEV_UNIT_ADDRESS to a value other than 0 is only required if multiple devices are connected to a single chip select (in Loop-Through or Bus-Through configuration). 4.10.11 Clear Sticky Counts Through Four Way Handshake There are four sticky counters that keep count of changes in status of primary and secondary carrier detect, rate changes, and lock changes. The counters can be read from the following four parameters in register 0x84 and 0x85: STAT_CNT_PRI_CD_CHANGES, STAT_CNT_SEC_CD_CHANGES, STAT_CNT_RATE_CHANGES, and STAT_CNT_PLL_LOCK_CHANGES. The counters saturate at 255 (0xFF) and must be cleared before additional status changes can be counted. The following four way handshake procedures clears the counters. 1. Poll STAT_CLEAR_COUNTS_STATUS parameter until equal to 0 (idle), then set CTRL_CLEAR_COUNTS = 1 (clear sticky counts). 2. Poll STAT_CLEAR_COUNTS_STATUS parameter until equal to 2 (cleared), then reset CTRL_CLEAR_COUNTS to 0. The device will now reset STAT_CLEAR_COUNTS_STATUS to 0 (idle) and the clearing process can be repeated at any time. 4.10.12 Device Power-Up Sequence The device does not require a specific power supply initialization sequence, and all chip supplies can be powered up simultaneously. If all power supplies cannot be guaranteed to power up simultaneously, ensure that VCC_DDI powers up first. Please note that there is no minimum time requirement between power supply initializations after VCC_DDI is energized. Note: Please check with your local FAE (field applications engineer), as some devices may need updated configuration settings. If a configuration file has been provided by the FAE, see the timing information in the Serial Routing and Distribution Product Configuration Loading Procedure Application Note (PDS-061176). 4.10.12.1 Power-Up Timing Sequence The following timing sequence must be observed after power-up when no external configuration loading is required. See Figure 4-39 for the timing requirements of Steps 1 and 2 below. Step 1 – No GSPI Access Allowed a) Device supply reaches 90% of target. POR (Power On Reset) is activated. b) Internal blocks reset, default device configuration boot-up begins. c) Default device configuration boot-up process. |
|
Link URL |
| Does ALLDATASHEET help your business so far? [ DONATE ] |
About Alldatasheet | Advertisement | Contact us | Privacy Policy | Link to Datasheet | Link Exchange | Manufacturer List All Rights Reserved©Alldatasheet.com |
| Russian : Alldatasheetru.com | Korean : Alldatasheet.co.kr | Spanish : Alldatasheet.es | French : Alldatasheet.fr | Italian : Alldatasheetit.com Portuguese : Alldatasheetpt.com | Polish : Alldatasheet.pl | Vietnamese : Alldatasheet.vn Indian : Alldatasheet.in | Mexican : Alldatasheet.com.mx | British : Alldatasheet.co.uk | New Zealand : Alldatasheet.co.nz |
|
Family Site : ic2ic.com |
icmetro.com |