| Electronic Components Datasheet Search |
|
GS3590 Datasheet(PDF) 20 Page - Semtech Corporation |
|
|
|||||||||||||||||||||||||||||
GS3590 Datasheet(HTML) 20 Page - Semtech Corporation |
|
20 / 118 page ![]() GS3590 Final Data Sheet Rev.4 PDS-061414 September 2017 20 of 118 Semtech Proprietary & Confidential www.semtech.com 4.2.2 Upstream Launch Swing Compensation The GS3590 Cable Equalizer has an automatic gain control circuit, that is optimized on the assumption that the Cable Driver in the upstream device is SMPTE-compliant and has a launch swing of 800mVpp ±10%. When the source amplitude is known to be non-SMPTE compliant, a compensation adjustment can be made in the GS3590. The GS3590 can adjust for launch swings in the range of 250mV to 1V in approximately 50mVppd increments. Upstream launch swing compensation can be adjusted through the CFG_EQ_INPUT_LAUNCH_SWING_COMP parameter in control register 0x18. The default parameter value is 80d (50h), which corresponds to a nominal launch swing of 800mVppd. 4.2.3 Carrier Detect, Squelch Control, and Loss of Signal The GS3590 Cable Equalizer has highly-configurable carrier detection and squelching capability. The carrier detection can be made more robust against spurious signals and noise at the inputs and the squelch control can be configured and enabled to reduce false outputs to low level signals such as crosstalk. The GS3590 reports two separate carrier detect parameters—STAT_PRI_CD and STAT_SEC_CD. They are described in Section 4.2.3.1 and Section 4.2.3.2 respectively. Note: The parameters referred to within Section 4.2.3 to Section 4.2.3.2 are linked to their respective registers in Table 4-1. 4.2.3.1 Primary Carrier Detection (STAT_PRI_CD) Configuration Primary carrier detection (STAT_PRI_CD) can be configured for higher stability by filtering-out longer transients or glitches. This can be achieved by increasing the sampling window over which the signal is sampled and the number of samples required to assert or de-assert it. There are three configuration parameters that control assertion or de-assertion of STAT_PRI_CD: CFG_CD_FILTER_SAMPLE_WIN CFG_FILTER_DEASSERT_CNT CFG_CD_FILTER_ASSERT_CNT See Figure 4-1 for a visual representation of the STAT_PRI_CD configuration parameters. With the default values in place: An assertion (setting HIGH) of STAT_PRI_CD will take place after a valid signal is present for ~6.5ms A de-assertion (setting LOW) of STAT_PRI_CD will take place after loss of a valid signal for ~96ms |
|
Link URL |
| Does ALLDATASHEET help your business so far? [ DONATE ] |
About Alldatasheet | Advertisement | Contact us | Privacy Policy | Link to Datasheet | Link Exchange | Manufacturer List All Rights Reserved©Alldatasheet.com |
| Russian : Alldatasheetru.com | Korean : Alldatasheet.co.kr | Spanish : Alldatasheet.es | French : Alldatasheet.fr | Italian : Alldatasheetit.com Portuguese : Alldatasheetpt.com | Polish : Alldatasheet.pl | Vietnamese : Alldatasheet.vn Indian : Alldatasheet.in | Mexican : Alldatasheet.com.mx | British : Alldatasheet.co.uk | New Zealand : Alldatasheet.co.nz |
|
Family Site : ic2ic.com |
icmetro.com |